Site demo, rough and fine grading, grade for tot-lots. Utilities - water main, fire main, domestic water, sewer, storm drain. Coordination with City of San Diego to bring water on to site.
Fine grade, balance landscape areas, site demo, clear and grub. Replace existing storm drain system, install new storm drain basin and French drain.
Site demo, rough and fine grade for combat water survival training facility, including excavation of two pools/training tanks.
Site demo, concrete and asphalt aircraft rated paving demo, rough grade and fine grade aircraft hangar, aprons and paving.
Rough grade, fine grade for three new locations (Area 21, Area 22, Area 52). Site demo, paving demo, gas station canopy demo, wet utility work, storm drain basins and liners.
Rough grade and fine grade for expansion at Miramar National Cemetery. Install HDPE water mains, storm drains, and structures. Screen and place +/- 30,000 cubic yards of select fill material.
Site demo, rough grade and fine grade.
Rough grade, fine grade, and export soil for various structures. Back fill hi-explosives magazine structure.
Site demolition, rough and finish grading for new campus road infrastructure, including the installation of recycled class II base for paving. Hi-line temporary sewer with temporary lift station.
Rough and fine grade, import of soil for new HQ building.
Site demo, rough and fine grading for operations facility.
Site demo, rough and fine grading for operations facility.
Site demo, electrical sub-station demo, restroom demo, auger cast piles, bulk excavate pool, and all aspects of grading.
Site demo, rough and finish grading, import of soil, installation of water and sewer utilities including a septic tank and leach field for a new indoor shooting range, and training building complex.
Landscape rock, grading for temporary facilities, drainage, and class II base parking lots at multiple locations.
Vibrated rock columns, over excavation and Tensar fill stabilization, sewer lift station, compressed air line, gas, sewer, water, and storm lines, and all finish grades.
Electrical right of way restoration, natural channel restoration, riprap, and transformer pad grading
Earthwork, import dirt, site demo, wet utilities and gas line. TE contracted on three phases of FIOC.
Demo pond, fill pond, re-plumb existing ponds and water features, grade for new building and future buildings, and all site utilities
Retaining wall sub drains, gabion flood control, riprap in environmental sensitive areas, earthwork, and export dirt
Foundation excavation, stabilized rock fill, de-watering, site work, site utilities and cut cap old utilities
Demolition, crushed concrete on site for class II base in paving areas, earthwork for six buildings and roads – over 25 acre site
Maintain 15 mile rd for construction, grade for urban village and streets on the range
Earthwork, coffer dam for boat ramp demo and grading
Replace all underground electrical, communications, sewer, water and storm drain; repave and or re-vegetate
Demolish six buildings, crush concrete on site to make class II base used in paving areas, all site utilities, and grading
All phases of construction from raw land to move in ready re-locatable classrooms, including play yard and parking lot